Contents:

Stainless steel profile

Installation of the profiles

Preparation

  1. Measuring
    Identify the required length. Pay attention to mitre joints.
  2. Planning
    Draw a floor plan and determine the possibly needed number of dowels and screws.
  3. Cutting
    Pay attention to mitre joints when cutting. Deburr the raw edges.

Installation with dowels

  1. Drill the holes.
  2. Position the dowel within the rail simply by sliding.
  3. Knock the profile in.

Installation with screws

  1. Drill the holes.
  2. Attach the profile with screws.

Installation with adhesive tape

  1. Tear off the protective paper.
  2. Press on the profile.

Top

CMS