My way of living!

Directly to: Navigation . Content . Contact information . Home . Sitemap . Imprint

Language selection: Deutsch Español Cesky


Guidance

Laminate installation guide for ceiling and wall panels

Required tools for wall & ceiling panel installation
Required tools
Acclimatise the panels before installation
Acclimiatise material before installation, store in installation room for 48 hours, at 15-30 °C and 40-70 % relative humidity
Draw up an installation plan > Make optimal use of off-cuts
Draw up an installation plan > Make optimal use of off-cuts
Apply sub-structure & lathing
Apply sub-structure / lathing
Use lathing on living rooms & counter lathing in wet rooms
Lathing on living rooms
Counter lathing in wet rooms
Ensure airflow and ventilation!
Ensure rear ventilation!
Cross beams must be lathed at the back.
Cross beams must be lathed at the back.
Put first panel into position and fix with nails or starting clip.
Put first panel into position and fix with nails or starting clip.
Attach panels with special claw CL 3.6 K or...
Attach panels with special claw CL 3.6 K or...
... with staples
... with staples
Lay the other panels...
Lay the other panels...
Choose between an invisible joint (A) or a cm joint (B).
Choose between an invisible joint (A) or a cm joint (B).
Mark out the last panel...
Mark out the last panel...
... and cut it to size
... and cut it to size
Insert the last panel...
Insert.
... and fix cover skirting into place.
Fix cover skirting into place.
 

Navigate here:

Project planner